FM technical liaison

From GrinnellWiki

Jump to: navigation, search

The EcoHouse FM Technical Liaison subgroup works closely with Facilities Management to improve the efficiency of the house by making upgrades and monitoring data.

Plans:

Summer Modifications

  • Monitoring
  • Energy
    • Whole house w/central display
    • Sub-metering at fuse boxes?
  • Water
    • All
    • Hot water
  • Gas
    • Overall
    • Cooking, water, heating
  • External
    • Light meter on roof
    • Anemometer
  • Internal
    • Thermometers in every room
    • Air quality before and after insulation?
    • Light audit (Energy Ninja style?)
  • Also keep records of local:
    • High and low outdoor temp
    • Cloud Cover?
    • Humidity?
  • Heating and Cooling:
    • Insulation
      • Fiberglass batting
      • Spray foam
    • Programmable thermostat? Applicable?
  • Waste:
    • Insulated outdoor composting bin
  • Rain Catchment System
    • PVC piping
    • Blue barrels
    • Caulk and caulking gun

Over Winter Break?

  • Water
    • .5 gpm faucet aerators
    • 1.5 gpm shower heads
    • Caroma dual-flush toilets (.08/1.6 gpf)
    • Insulate Pipes & heater
    • Solar water heating?
  • Lighting
    • LED/Flourencent lighting
      • Task lighting?
    • Occupancy sensors/rheostat
    • Day lighting
  • Heating
    • Home tightening strategies from IEC as needed
    • Caulking
    • Weather-stripping
    • Ventilation as needed
    • Low-e window coating
    • Insulate Pipes

Long Term

  • Insulation
    • Blow in insulation
      • Maximize Applicability
  • Heating
    • Geothermal
    • Solar hot water
    • Passive Solar/Solar-to-Air
    • Heat recovery ventilators
  • Waste
    • Anaerobic digester???
  • Appliances
    • More efficient
  • Rain Catchment
    • Flush Toilets


Resources

Iowa Energy Home Series

USGBC ReGreen

(http://www.greenhomeguide.org/documents/regreen_guidelines.pdf)